...

d.3 Energy ASX / Media Release

D3 Energy production testing RBD03

OUTSTANDING RESULTS FROM INITIAL PRODUCTION TESTING AT RBD03

Highlights

  • RBD03 flowed gas at a stabilised flow rate of 149 Mscfd for a 7-day period.
  • The stabilised flow rate is almost double the previous flow rate measured with previous testing kit.
  • Company to re-test the recently drilled RBD10 borehole with new testing equipment.

Leave a Reply

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.