OUTSTANDING RESULTS FROM INITIAL PRODUCTION TESTING AT RBD03
Highlights
- RBD03 flowed gas at a stabilised flow rate of 149 Mscfd for a 7-day period.
- The stabilised flow rate is almost double the previous flow rate measured with previous testing kit.
- Company to re-test the recently drilled RBD10 borehole with new testing equipment.
Recent Comments